Building our house – Day 5 – Delivery of formwork for the foundation
On the fifth day of construction (the next after the concreting of the foundation pads) formwork was dismantled and brought it under the pillow forms for the foundation. These forms are a kind of collapsible reusable designers – such as Lego. They were taken by truck and unloaded by crane. Our house with garage for 2 cars – so you can see the step – by digging a pit garage is less under the house – more unnecessarily basement in the future will be finished and there are also living rooms. The ceilings in the basement will be 2.75 metra. Takzhe in the basement will have 2 large windows and built-in communications for more vannoy. Mozhno note that the pillow embedded pipes. Apparently it is for the drainage system. Under the house to be output to a central sewer system. That would house not flooded in the event of rain or the elements, on all sides at home are drainage wells, the water of which goes to the central kanalizatsiyu. Erik plays with a peg on which the authorities listed our future adres. Kogda went to the construction site notice as one of the houses raised tap the roof. In Canada, it’s fairly common practice – is mounted on the roof of the road near the house and then lifted by crane and installed.